List of References
2016
FUEL & ASH HANDLING SYSTEM
PRAKASA, SAMUTPRAKARN
(APCON POWER PLANT, 2016)
Material:
TRASH & WASTE (RDF)
System:
SCREW &SUBMEGED CHAIN CONVEYOR
Description
- DESIGN
- MANUFACTURING
- INSTALLATION

FUEL & ASH HANDLING SYSTEM
TEPHA, SONGKHLA
(BIOMASS POWER PLANT, 2016)
Material:
PARAWOOD CHIP
System:
BELT,CHAIN, SCREW &SUBMEGED CHAIN CONVEYOR
Description
- DESIGN
- MANUFACTURING
- INSTALLATION

FUEL HANDLING SYSTEM
SRABURI, THAILAND
(ETC ENGINEERING, 2016)
Capacity:
5 Tons/Hour
System:
BELT,CHAIN,ROLLER BELT CONVEYOR
Description
- DESIGN
- MANUFACTURING
- INSTALLATION

ASH HANDLING SYSTEM
SRABURI, THAILAND
(ETC ENGINEERING, 2016)
Capacity:
0.5-7 CBM/Hr/direction
System:
SCREW, SUBMERGED, CHAIN CONVEYOR
Description
- DESIGN
- MANUFACTURING
- INSTALLATION

2010-2013
TRUCK TILTER & FUEL HANDLING SYSTEM
ADVANCE AGRO
(2011-2013)
Capacity:
250 TONS/HOUR
Cost:
49 MILLION THB
Description
- DESIGN
- MANUFACTURING
- INSTALLATION

WET CAKE DILUTION PLANT FOR ETHANOL PROCESS
DOUBLE A
(2011-2012)
Capacity:
700 TONS/DAY
Cost:
26 MILLION THB
Description
- DESIGN
- MANUFACTURING
- INSTALLATION

BELT CONVEYOR AND SCREW FEEDER
BUA SIMMAI
(2010-2011)
Capacity:
300 TONS/DAY
Cost:
6 MILLION THB
Description
- DESIGN
- MANUFACTURING
- INSTALLATION

WOOD CHIP LOADING SYSTEM
AAWTHAI
(2011)
Capacity:
600 TONS/HOUR
Cost:
60 MILLION THB
Description
- DESIGN
- MANUFACTURING
- INSTALLATION

2006-2008
BOTTOM ASH SYSTEM
ADVANCE AGRO
(2008)
Capacity:
N/A
Cost:
1 MILLION THB
Description
- DESIGN+MODIFY
- MANUFACTURING
- INSTALLATION

WOOD CHIP CONVEYOR SYSTEM
ADVANCE AGRO
(2008)
Capacity:
300 TONS/DAY
Cost:
8 MILLION THB
Description
- DESIGN+MODIFY
- FACTORY EXPANSIONS

TRUCK TILTER PROJECT
ADVANCE AGRO
(2008)
Capacity:
60 TONS
Length:
15 METER
Cost:
5.8 MILLION THB
Description
- DESIGN
- MANUFACTURING
- INSTALLATION

BELT CONVEYOR SYSTEM
CHEME MAN
(2007)
Capacity:
N/A
Cost:
5 MILLION THB
Description
- DESIGN AND MANUFACTURE BUCKET ELEVETOR AND SILO WITH BELT CONVEYOR

CONVEYOR SYSTEM AND PALLETIZING MACHINES
THAI GLASS INDUSTRIES
(2006)
Capacity:
2X500 BPM MAX
Cost:
11 MILLION THB
Description
- TURN KEY;DESIGN AND INSTALL CONVEYOR SYSTEM AND PALLETIZING MACHINES

CONVEYOR SYSTEM AND MACHINES
THAI PURE DRINK
(2006)
Capacity:
300 BPM MAX
Cost:
9 MILLION THB
Description
- TURN KEY;DESIGN AND INSTALL CONVEYOR SYSTEM. FILLING MACHINE, LABELING MACHINE AND SHRINK SLEEVING MACHINR

CONVEYOR SYSTEM AND MACHINES
MUANG MAI GUTHIRE
(2006)
Capacity:
BOP
Cost:
5 MILLION THB
Description
- TURN KEY; BOP OF HEATING-CHILLING SYSTEM PIPING, ACTIVATOR, MIXING PROCESS, RECONDITION BOILER AND CHILLING SYSTEM